Engineering works: Maastricht - Liège / Luik
Current status:
Engineering works are finished.
Situation
Between Maastricht and Visé buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Monday, June 27, 2022 10:15 PM hours and Saturday, July 2, 2022 2:00 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Maastricht, Maastricht Randwyck, Eijsden and Visé.
- Stoptrein 5300 Maastricht - Liège-Guillemins is cancelled between Maastricht and Visé
- Buses are running between Maastricht, Maastricht Randwyck, Eijsden and Visé.
- Stoptrein 5300 Maastricht - Liège-Guillemins is cancelled between Maastricht and Visé
- Buses are running between Maastricht, Maastricht Randwyck, Eijsden and Visé.
- Stoptrein 5300 Maastricht - Liège-Guillemins is cancelled between Maastricht and Visé
- Buses are running between Maastricht, Maastricht Randwyck, Eijsden and Visé.
- Stoptrein 5300 Maastricht - Liège-Guillemins is cancelled between Maastricht and Visé
- Buses are running between Maastricht, Maastricht Randwyck, Eijsden and Visé.
- Stoptrein 5300 Maastricht - Liège-Guillemins is cancelled between Maastricht and Visé
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Monday, June 27, 2022 10:15 PM to Tuesday, June 28, 2022 2:00 AM
- Tuesday, June 28, 2022 10:15 PM to Wednesday, June 29, 2022 2:00 AM
- Wednesday, June 29, 2022 10:15 PM to Thursday, June 30, 2022 2:00 AM
- Thursday, June 30, 2022 10:15 PM to Friday, July 1, 2022 2:00 AM
- Friday, July 1, 2022 10:15 PM to Saturday, July 2, 2022 2:00 AM