engineering works

Engineering works: Amsterdam Centraal

Situation

From and to Amsterdam Centraal buses are running due to engineering works.
The extra travel time may be up to 15 minutes.

Period

In the night from Friday to Saturday, June 25, 2022 between 1:00 AM and 6:15 AM hours.

Advice

Passengers between Amsterdam Centraal and Utrecht Centraal travel via Schiphol Airport.

Last update:

Location of these engineering works

These engineering works take place around Amsterdam Centraal.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Saturday, June 25, 2022 1:00 AM and Saturday, June 25, 2022 6:15 AM.