Engineering works: Amsterdam - Rotterdam - Brussel (HSL)
Current status:
Engineering works are finished.
Situation
Between Amsterdam Centraal and Breda: restrictions are cancelled. Trains are running according to the timetable.
Period
Between Saturday, May 28, 2022 4:00 AM hours and Monday, May 30, 2022 2:00 AM hours.
Last update:
Modified timetable
The timetable has not been modified for these engineering works.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, May 28, 2022 4:00 AM and Monday, May 30, 2022 2:00 AM.