Engineering works Heerlen - Maastricht; Maastricht - Randwijck

Engineering works
Engineering works are finished.

Travel advice

Period

Between Saturday, May 28, 2022 4:00 AM hours and Monday, May 30, 2022 1:15 AM hours.

Situation

Between Maastricht and Maastricht Randwyck: restrictions are cancelled. Trains are running according to the timetable.
Between Valkenburg and Maastricht: restrictions are cancelled. Trains are running according to the timetable.

May 30, 2022 1:15 AM

Affected lines

The following lines are affected by these engineering works:

Time periods

This disruption is active between Saturday, May 28, 2022 4:00 AM and Monday, May 30, 2022 1:15 AM.