Engineering works: Den Haag - Rotterdam
Current status:
Engineering works are finished.
Situation
Between Den Haag Centraal and Rotterdam Centraal the timetable has been changed due to engineering works.
You have no extra travel time.
Period
On Sunday, May 29, 2022 between 12:10 AM and 8:30 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1100 Den Haag C. - Rotterdam C. - Eindhoven C. is cancelled between Rotterdam Centraal and Den Haag Centraal (only in direction of Den Haag Centraal)
- Intercity 1100 Den Haag C. - Rotterdam C. - Eindhoven C. is cancelled between Den Haag Centraal and Rotterdam Centraal (only in direction of Rotterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, May 29, 2022 12:10 AM and Sunday, May 29, 2022 8:30 AM.