Engineering works: Almere - Lelystad
Situation
Between Lelystad Centrum and Almere Oostvaarders the timetable has been changed due to engineering works.
There is no additional travel time..
Period
In the night from Thursday to Friday, February 25, 2022 between 4:00 AM and 5:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp is cancelled between Lelystad Centrum and Almere Oostvaarders (only in direction of Almere Oostvaarders)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, February 25, 2022 4:00 AM and Friday, February 25, 2022 5:00 AM.