Engineering works on the high-speed line: Rotterdam - Breda (HSL)
Situation
Between Rotterdam Centraal and Breda no trains are running on the high-speed line due to engineering works on the high-speed line.
You have no extra travel time.
Period
Between Saturday, January 22, 2022 4:00 AM hours and Monday, January 24, 2022 2:00 AM hours.
Advice
Passengers between Den Haag Centraal and Tilburg and Eindhoven Centraal travel via Utrecht Centraal. You have no extra travel time.
Passengers between Rotterdam Centraal and Breda travel via Zwijndrecht. You have no extra travel time.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda is cancelled between Rotterdam Centraal and Breda
- Intercity 1100 Den Haag C. - Rotterdam C. - Eindhoven C. is cancelled between Den Haag Centraal and Eindhoven Centraal
- Intercity direct 9200 Amsterdam C. - Rotterdam C. - Antwerpen-C. - Brussel-Z. Midi is cancelled between Amsterdam Centraal and Breda
- Intercity 28500 Breda - Eindhoven C. runs as extra service between Breda and Eindhoven Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, January 22, 2022 4:00 AM and Monday, January 24, 2022 2:00 AM.