Engineering works elsewhere: Den Haag - Rotterdam
Current status:
Engineering works are finished.
Situation
Between Den Haag Centraal and Rotterdam Centraal the timetable has been changed due to engineering works elsewhere.
You have no extra travel time.
Period
Between Saturday, January 22, 2022 4:00 AM hours and Monday, January 24, 2022 2:00 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1100 Den Haag C. - Rotterdam C. - Eindhoven C. is cancelled between Den Haag Centraal and Eindhoven Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, January 22, 2022 4:00 AM and Monday, January 24, 2022 2:00 AM.