Engineering works: Schiphol - Utrecht
Current status:
Engineering works are finished.
Situation
Between Utrecht Centraal and Schiphol Airport the timetable has been changed due to engineering works.
You have no extra travel time.
Period
On Sunday, December 19, 2021 between 10:40 PM and 11:30 PM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo is cancelled between Utrecht Centraal and Schiphol Airport (only in direction of Schiphol Airport)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, December 19, 2021 10:40 PM and Sunday, December 19, 2021 11:30 PM.