engineering works

Engineering works: Amsterdam - Utrecht; Schiphol - Utrecht

Situation

Between Amsterdam Centraal and Utrecht Centraal the timetable has been changed due to engineering works.
Between Schiphol Airport and Utrecht Centraal the timetable has been changed due to engineering works.

Period

On Sunday, November 28, 2021 between 4:00 AM and 5:00 PM hours.

Advice

Passengers between Schiphol Airport and Utrecht Centraal travel via Duivendrecht. You have no extra travel time.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, November 28, 2021 4:00 AM and Sunday, November 28, 2021 5:00 PM.