engineering works

Engineering works: Utrecht - Arnhem; Utrecht - Rhenen

Situation

Between Utrecht Centraal and Ede-Wageningen buses are running due to engineering works.
Between Utrecht Centraal and Rhenen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, November 20, 2021 1:00 AM hours and Monday, November 22, 2021 2:00 AM hours.

Advice

Passengers between Utrecht Vaartsche Rijn and Driebergen-Zeist and Rhenen travel via Utrecht Centraal. You have no extra travel time.
Passengers between Utrecht Centraal and Nijmegen travel via 's-Hertogenbosch. The extra travel time is up to 30 minutes.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, November 20, 2021 1:00 AM and Monday, November 22, 2021 2:00 AM.