engineering works

Engineering works: Amsterdam - Lelystad Centrum; Schiphol - Lelystad; Almere - Zwolle

Situation

Between Almere Oostvaarders and Zwolle the timetable has been changed due to engineering works.
Between Weesp and Almere Oostvaarders buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, October 30, 2021 4:00 AM hours and Monday, November 1, 2021 2:00 AM hours.

Advice

Passengers between Amsterdam Centraal and Zwolle travel via Utrecht Centraal and Amsterdam Zuid.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, October 30, 2021 4:00 AM and Monday, November 1, 2021 2:00 AM.