engineering works

Engineering works: Amsterdam - Hannover - Berlin

Situation

Between Bad Bentheim and Berlin Hbf the international timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.

Period

Between Friday, October 8, 2021 8:55 AM hours and Friday, October 15, 2021 10:40 PM hours.

Last update:

Location of these engineering works

These engineering works take place between Bad Bentheim and Berlin Hbf.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

The timetable has not been modified for these engineering works.

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, October 8, 2021 8:55 AM and Friday, October 15, 2021 10:40 PM.