Engineering works Amsterdam - Brussel - Paris (HSL)

Engineering works
Warning: These engineering works haven't started yet.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Travel advice

Period

Between Saturday, October 30, 2021 4:00 AM hours and Monday, November 1, 2021 2:00 AM hours.

Situation

Between Rotterdam Centraal and Brussel-Zuid Midi the international timetable has been changed due to engineering works.

Modified timetable

During this disruption, the timetable has been modified. The following changes have been made to the train schedule:
For the full duration of this disruption:
  • Thalys 9300 (Amsterdam C. - Rotterdam C. - Brussel-Z. Midi - Paris-Nord): has a changed schedule between Rotterdam Centraal and Brussel-Zuid Midi
Oct 11, 2021 2:05 PM

Affected lines

The following lines are affected by these engineering works:

Time periods

This disruption is active between Saturday, October 30, 2021 4:00 AM and Monday, November 1, 2021 2:00 AM.