Engineering works: Amsterdam - Brussel - Paris (HSL)
Current status:
Engineering works are finished.
Situation
Between Amsterdam Centraal and Brussel-Zuid Midi are international trains diverted due to engineering works.
The extra travel time is about 30 minutes.
Period
Between Saturday, October 23, 2021 4:00 AM hours and Monday, October 25, 2021 2:00 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Thalys 9300 Amsterdam C. - Rotterdam C. - Brussel-Z. Midi - Paris-Nord is diverted between Rotterdam Centraal and Antwerpen-Centraal
- Thalys 9300 Amsterdam C. - Rotterdam C. - Brussel-Z. Midi - Paris-Nord is cancelled between Rotterdam Centraal and Amsterdam Centraal (only in direction of Amsterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, October 23, 2021 4:00 AM and Monday, October 25, 2021 2:00 AM.