engineering works

Engineering works: Schiphol - Lelystad; Schiphol - Amersfoort

Situation

Between Amsterdam RAI and Weesp is de dienstregeling aangepast en rijden er bussen due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, September 18, 2021 1:00 AM hours and Monday, September 20, 2021 2:00 AM hours.

Advice

Passengers between Schiphol Airport and Amersfoort Centraal and Zwolle travel via Utrecht Centraal. The extra travel time is up to 30 minutes.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, September 18, 2021 1:00 AM and Monday, September 20, 2021 2:00 AM.