engineering works

Engineering works: Utrecht - 's-Hertogenbosch

Situation

Between Utrecht Centraal and 's-Hertogenbosch the timetable has been changed due to engineering works.
The extra travel time may be up to 45 minutes.

Period

Between Saturday, August 21, 2021 12:50 AM hours and Monday, August 23, 2021 2:00 AM hours.

Advice

Passengers between Eindhoven Centraal and Schiphol Airport and Amsterdam Centraal travel via Rotterdam Centraal. You have no extra travel time.
Passengers between Houten Castellum and Geldermalsen travel via Houten. You have no extra travel time.
Passengers between Utrecht Centraal and 's-Hertogenbosch travel via Nijmegen. You have no extra travel time.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, August 21, 2021 12:50 AM and Monday, August 23, 2021 2:00 AM.