engineering works elsewhere

Engineering works elsewhere: Schiphol - Lelystad

Situation

Between Amsterdam Zuid and Lelystad Centrum the timetable has been changed due to engineering works elsewhere.

Period

Between Saturday, May 1, 2021 1:00 AM hours and Tuesday, May 4, 2021 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, May 1, 2021 1:00 AM and Tuesday, May 4, 2021 2:00 AM.