engineering works

Engineering works: Amsterdam - Lelystad Centrum; Schiphol - Lelystad

Situation

Between Weesp and Almere Oostvaarders the timetable has been changed due to engineering works.
Between Schiphol Airport and Lelystad Centrum the timetable has been changed due to engineering works.
The extra travel time may be up to 45 minutes.

Period

Between Saturday, March 20, 2021 4:00 AM hours and Monday, March 22, 2021 2:00 AM hours.

Advice

Passengers between Zwolle and Amsterdam Centraal and Schiphol Airport travel via Amersfoort Centraal. You have no extra travel time.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, March 20, 2021 4:00 AM and Monday, March 22, 2021 2:00 AM.