Engineering works: Amsterdam - Hannover - Berlin
Situation
Between Amsterdam Centraal and Bad Bentheim the international timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Sunday, January 31, 2021 4:00 AM hours and Monday, February 1, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Deventer and Bad Bentheim.
- Local buses are running between Almelo, Hengelo and Bad Bentheim.
- Intercity 140 to 149 Amsterdam C. - Hengelo - Hannover Hbf - Berlin Ostbhf is cancelled between Amsterdam Centraal and Bad Bentheim
- Intercity 240 to 240 Amsterdam C. - Hengelo - Hannover Hbf - Berlin Ostbhf is cancelled between Amsterdam Centraal and Bad Bentheim
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, January 31, 2021 4:00 AM and Monday, February 1, 2021 2:00 AM.