engineering works

Engineering works: Venlo - Mönchengladbach - Düsseldorf

Situation

Between Mönchengladbach Hbf and Düsseldorf Hbf the international timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.

Period

Between Friday, February 19, 2021 8:45 PM hours and Wednesday, March 3, 2021 11:00 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, February 19, 2021 8:45 PM and Wednesday, March 3, 2021 11:00 PM.