Engineering works elsewhere: Rotterdam - Breda (HSL)
Situation
Between Breda and Rotterdam Centraal the timetable has been changed due to engineering works elsewhere.
The extra travel time is about 30 minutes.
Period
On Sunday, January 31, 2021 between 7:40 AM and 8:10 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda is cancelled between Breda and Rotterdam Centraal (only in direction of Rotterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, January 31, 2021 7:40 AM and Sunday, January 31, 2021 8:10 AM.