engineering works

Engineering works: Amersfoort - Deventer

Situation

Between Apeldoorn and Zutphen buses are running due to engineering works.
Between Amersfoort Centraal and Deventer buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Wednesday, February 17, 2021 4:00 AM hours and Monday, March 1, 2021 2:00 AM hours.

Advice

Passengers between Amersfoort Centraal and Deventer travel via Zwolle.
Passengers between Apeldoorn Osseveld and Deventer travel via Apeldoorn.
Passengers between Utrecht Centraal and Deventer travel via Arnhem Centraal.

Last update:

Location of these engineering works

These engineering works take place between Apeldoorn and Zutphen and between Amersfoort Centraal and Deventer.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Wednesday, February 17, 2021 4:00 AM to Saturday, February 27, 2021 2:00 AM
  • Saturday, February 27, 2021 4:00 AM to Monday, March 1, 2021 2:00 AM