Engineering works Utrecht - Hilversum; Utrecht - Almere

Engineering works
Warning: Currently taking place.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Travel advice

Period

Between Monday, February 22, 2021 4:00 AM hours and Saturday, February 27, 2021 2:00 AM hours.

Situation

Between Utrecht Centraal and Hilversum the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.

Advice

Passengers between Utrecht Centraal and Almere Centrum travel via Amsterdam Zuid. The extra travel time is up to 15 minutes.
Passengers between Naarden-Bussum and Almere Centrum travel via Weesp. The extra travel time is up to 15 minutes.

Modified timetable

During this disruption, the timetable has been modified. The following changes have been made to the train schedule:
For the full duration of this disruption:
  • Local buses are running between Utrecht Overvecht, Hollandsche Rading, Hilversum Sportpark and Hilversum.
  • Intercity 1500 (Amsterdam C. - Amersfoort C.): will make an extra stop at Naarden-Bussum
  • Sprinter 4900 (Utrecht C. - Hilversum - Almere C.): is cancelled between Utrecht Centraal and Almere Centrum
  • Sprinter 5700 (Utrecht C. - Hilversum - Hoofddorp): is cancelled between Utrecht Centraal and Hoofddorp
  • Sprinter 14900 (Utrecht C. - Hilversum - Almere C.): is cancelled between Utrecht Centraal and Almere Centrum
Feb 24, 2021 2:17 PM

Affected lines

The following lines are affected by these engineering works:

Time periods

This disruption is active between Monday, February 22, 2021 4:00 AM and Saturday, February 27, 2021 2:00 AM.