engineering works

Engineering works: Hoofddorp - Schiphol - Almere Oostvaarders; Schiphol - Utrecht

Situation

Between Schiphol Airport and Amsterdam Zuid the timetable has been changed due to engineering works.
Between Hoofddorp and Almere Centrum the timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.

Period

Between Saturday, February 6, 2021 4:00 AM hours and Sunday, February 7, 2021 1:05 PM hours.

Advice

Passengers between Schiphol Airport and Almere Centrum travel via Amsterdam Centraal. The extra travel time is up to 30 minutes.
Passengers between Den Haag Centraal and Zwolle travel via Utrecht Centraal.
Passengers between Amsterdam RAI and Duivendrecht travel via Amsterdam Zuid. The extra travel time is up to 15 minutes.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Saturday, February 6, 2021 4:00 AM and Sunday, February 7, 2021 1:05 PM.