Engineering works: Schiphol - Utrecht
Situation
Between Schiphol Airport and Amsterdam Zuid the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
On Thursday, February 4, 2021 between 10:30 AM and 2:30 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen is cancelled between Schiphol Airport and Amsterdam Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Thursday, February 4, 2021 10:30 AM and Thursday, February 4, 2021 2:30 PM.