Engineering works elsewhere: Duivendrecht - Lelystad
Situation
Between Duivendrecht and Lelystad Centrum the timetable has been changed due to engineering works elsewhere.
There is no additional travel time..
Period
Between Saturday, January 23, 2021 4:00 AM hours and Sunday, January 24, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Dordrecht and Lelystad Centrum
- Intercity 3700 Dordrecht - Schiphol Airport - Utrecht C. - Venlo runs twice per hour between Dordrecht and Venlo
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, January 23, 2021 4:00 AM and Sunday, January 24, 2021 2:00 AM.