Engineering works: Utrecht - Woerden
Situation
Between Utrecht Centraal and Woerden has the timetable been adjusted and Intercity's keep running due to engineering works.
The extra travel time may be up to 15 minutes.
Period
On Sunday, January 24, 2021 between 4:00 AM and 4:30 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Utrecht Centraal, Utrecht Leidsche Rijn, Utrecht Terwijde, Vleuten and Woerden.
- Sprinter 6900 Den Haag C. - Utrecht C. - Tiel is cancelled between Utrecht Centraal and Woerden
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, January 24, 2021 4:00 AM and Sunday, January 24, 2021 4:30 PM.