Engineering works elsewhere: Amsterdam - Schiphol - Rotterdam (HSL)
Situation
Between Schiphol Airport and Rotterdam Centraal the timetable has been changed due to engineering works elsewhere.
The extra travel time may be up to 15 minutes.
Period
Between Saturday, January 16, 2021 4:00 AM hours and Monday, January 18, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 1000 Amsterdam C. - Schiphol Airport - Rotterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, January 16, 2021 4:00 AM and Monday, January 18, 2021 2:00 AM.