Engineering works: Zwolle - Groningen
Situation
Between Hoogeveen and Assen the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Saturday to Sunday, December 13, 2020 between 12:40 AM and 1:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 700 Den Haag C. - Schiphol Airport - Lelystad C. - Groningen is cancelled between Hoogeveen and Assen (only in direction of Assen)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Sunday, December 13, 2020 12:40 AM and Sunday, December 13, 2020 1:00 AM.