Engineering works: Hilversum - Amersfoort; Amersfoort - Deventer
Situation
Between Baarn and Amersfoort Centraal the timetable has been changed due to engineering works.
Between Amersfoort Centraal and Deventer the timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.
Period
Between Friday, November 27, 2020 4:00 AM hours and Monday, November 30, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1500 Amsterdam C. - Amersfoort C. will make an extra stop at Baarn
- Intercity 1600 Schiphol Airport - Amersfoort C. - Hengelo - Enschede is cancelled between Amersfoort Centraal and Enschede
- Intercity 2000 Den Haag C. - Utrecht C. is cancelled between Amersfoort Centraal and Deventer
- Intercity 11700 Den Haag C. - Utrecht C. - Schothorst runs as extra service between Amersfoort Centraal and Enschede
- Sprinter 15800 Amsterdam C. - Vathorst is cancelled between Baarn and Amersfoort Vathorst
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, November 27, 2020 4:00 AM and Monday, November 30, 2020 2:00 AM.