Engineering works: Hengelo - Bielefeld
Current status:
Engineering works are finished.
Situation
Between Hengelo and Oldenzaal buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Wednesday, November 25, 2020 4:00 AM hours and Sunday, December 6, 2020 2:00 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Hengelo, Oldenzaal and Bad Bentheim.
- Niet instappen 20300 to 20349 Maastricht - Heerlen - Aachen Hbf is cancelled between Hengelo and Bad Bentheim
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Wednesday, November 25, 2020 4:00 AM and Sunday, December 6, 2020 2:00 AM.