Engineering works elsewhere: Schiphol - Lelystad
Situation
Between Almere Centrum and Weesp buses are running due to engineering works elsewhere.
The extra travel time is about 30 minutes.
Period
Between Saturday, December 19, 2020 5:00 AM hours and Sunday, December 20, 2020 5:45 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Almere Centrum, Almere Muziekwijk, Almere Poort and Weesp.
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp is cancelled between Almere Centrum and Weesp (only in direction of Weesp)
- Buses are running between Almere Centrum, Almere Muziekwijk, Almere Poort and Weesp.
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp is cancelled between Almere Centrum and Weesp (only in direction of Weesp)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Saturday, December 19, 2020 5:00 AM to Saturday, December 19, 2020 5:25 AM
- Sunday, December 20, 2020 4:30 AM to Sunday, December 20, 2020 5:45 AM