Engineering works: Zwolle - Groningen
Situation
Between Assen and Groningen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, December 12, 2020 4:00 AM hours and Monday, December 14, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Minibuses are available between Haren and Haren OV Transferium.
- Local buses are running between Assen, Haren, Groningen Europapark and Groningen.
- Express buses are running between Assen and Groningen.
- Intercity 500 Rotterdam C. - Utrecht C. - Zwolle - Groningen is cancelled between Assen and Groningen
- Intercity 700 Den Haag C. - Schiphol Airport - Lelystad C. - Groningen is cancelled between Assen and Groningen
- Sprinter 8100 Zwolle - Groningen is cancelled between Assen and Groningen
- Local buses are running between Hoogeveen, Beilen, Assen, Haren, Groningen Europapark and Groningen.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, December 12, 2020 4:00 AM and Monday, December 14, 2020 2:00 AM.