Engineering works elsewhere: Utrecht - Nijmegen
Situation
Between Nijmegen and Utrecht Centraal the timetable has been changed due to engineering works elsewhere.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, December 5, 2020 4:00 AM hours and Monday, December 7, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity
3000
Den Helder - Amsterdam C. - Utrecht C. - Nijmegen
- is cancelled between Nijmegen and Arnhem Centraal (only in direction of Arnhem Centraal)
- does not call at Driebergen-Zeist (only in direction of Utrecht Centraal)
- Intercity 703000 Nijmegen - Arnhem C. runs as extra service between Nijmegen and Arnhem Centraal (only in direction of Arnhem Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, December 5, 2020 4:00 AM and Monday, December 7, 2020 2:00 AM.