Engineering works: Zwolle
Situation
From and to Zwolle the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, December 5, 2020 1:00 AM hours and Monday, December 7, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Zwolle, Wijhe and Olst.
- Buses are running between Zwolle and Dalfsen.
- Buses are running between Zwolle and Raalte.
- Buses are running between Zwolle and Meppel.
- Intercity 500 Rotterdam C. - Utrecht C. - Zwolle - Groningen is cancelled between Zwolle and Meppel
- Intercity 600 Rotterdam C. - Utrecht C. - Zwolle - Leeuwarden is cancelled between Zwolle and Meppel
- Intercity 700 Den Haag C. - Schiphol Airport - Lelystad C. - Groningen is cancelled between Zwolle and Meppel
- Intercity 1800 Den Haag C. - Schiphol Airport - Lelystad C. - Leeuwarden is cancelled between Zwolle and Meppel
- Intercity 3600 Zwolle - Deventer - Nijmegen - Roosendaal is cancelled between Zwolle and Olst
- Sneltrein 3800 Zwolle - Emmen is cancelled between Zwolle and Dalfsen
- Sprinter 7900 Zwolle - Almelo - Enschede is cancelled between Zwolle and Raalte
- Stoptrein 8000 Zwolle - Emmen is cancelled between Zwolle and Dalfsen
- Sprinter 8100 Zwolle - Groningen is cancelled between Zwolle and Meppel
- Express buses are running between Zwolle, Assen and Groningen.
- Local buses are running between Zwolle, Meppel, Hoogeveen, Beilen, Assen, Haren, Groningen Europapark and Groningen.
- Local buses are running between Beilen, Assen, Haren, Groningen Europapark and Groningen.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, December 5, 2020 1:00 AM and Monday, December 7, 2020 2:00 AM.