Engineering works: Amsterdam - Utrecht
Situation
Between Amsterdam Centraal and Utrecht Centraal buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Sunday, December 6, 2020 1:00 AM hours and Monday, December 7, 2020 3:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Amsterdam Centraal, Amsterdam Bijlmer ArenA and Utrecht Centraal.
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is diverted and will not call at Amsterdam Bijlmer ArenA between Amsterdam Centraal and Utrecht Centraal
- Buses are running between Amsterdam Centraal, Amsterdam Bijlmer ArenA and Utrecht Centraal.
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is diverted and will not call at Amsterdam Bijlmer ArenA between Amsterdam Centraal and Utrecht Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Sunday, December 6, 2020 1:00 AM to Sunday, December 6, 2020 3:00 AM
- Monday, December 7, 2020 1:00 AM to Monday, December 7, 2020 3:30 AM