Engineering works: Breukelen - Utrecht - Veenendaal
Situation
Between Maarssen and Bunnik the timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.
Period
On Sunday, November 29, 2020 between 2:30 PM and 7:15 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 7300 Breukelen - Rhenen does not call at Utrecht Zuilen and Utrecht Vaartsche Rijn (only in direction of Rhenen)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, November 29, 2020 2:30 PM and Sunday, November 29, 2020 7:15 PM.