Engineering works: Horst-Sevenum
Situation
From and to Horst-Sevenum the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, November 21, 2020 10:15 AM hours and Sunday, November 22, 2020 8:40 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3700 Dordrecht - Schiphol Airport - Utrecht C. - Venlo does not call at Horst-Sevenum (only in direction of Venlo)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, November 21, 2020 10:15 AM and Sunday, November 22, 2020 8:40 PM.