Engineering works: Amsterdam - Köln - Basel SBB
Current status:
Engineering works are finished.
Situation
Between Amsterdam Centraal and Emmerich the international timetable has been changed due to engineering works.
You have no extra travel time.
Period
Between Saturday, November 21, 2020 4:00 AM hours and Monday, November 23, 2020 2:00 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
ICE International
104 to 105
Amsterdam C. - Utrecht C. - Arnhem C. - Basel Bad Bf
- is being diverted and will make an extra call at 's-Hertogenbosch and Mönchengladbach Hbf between Amsterdam Centraal and Köln Hbf
- is diverted and will not call at Arnhem Centraal, Düsseldorf Hbf and Duisburg Hbf between Amsterdam Centraal and Köln Hbf
-
ICE International
120 to 129
Amsterdam C. - Utrecht C. - Arnhem C. - Frankfurt Hbf
- is being diverted and will make an extra call at 's-Hertogenbosch and Mönchengladbach Hbf between Amsterdam Centraal and Köln Hbf
- is diverted and will not call at Arnhem Centraal, Düsseldorf Hbf and Duisburg Hbf between Amsterdam Centraal and Köln Hbf
-
ICE International
220 to 229
Amsterdam C. - Utrecht C. - Arnhem C. - Frankfurt Hbf
- is being diverted and will make an extra call at 's-Hertogenbosch and Mönchengladbach Hbf between Amsterdam Centraal and Köln Hbf
- is diverted and will not call at Arnhem Centraal, Düsseldorf Hbf and Duisburg Hbf between Amsterdam Centraal and Köln Hbf
- ICE International 104 to 105 Amsterdam C. - Utrecht C. - Arnhem C. - Basel Bad Bf is cancelled between Karlsruhe Hbf and Basel SBB (only in direction of Basel SBB)
- ICE International 104 to 105 Amsterdam C. - Utrecht C. - Arnhem C. - Basel Bad Bf is cancelled between Baden-Baden and Basel SBB
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, November 21, 2020 4:00 AM and Monday, November 23, 2020 2:00 AM.