Engineering works: Breukelen - Utrecht - Veenendaal
Situation
Between Breukelen and Veenendaal Centrum the timetable is changed due to engineering works.
There is no additional travel time..
Period
On Sunday, October 11, 2020 between 2:30 PM and 7:15 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen does not call at Utrecht Zuilen and Utrecht Vaartsche Rijn (only in direction of Rhenen)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, October 11, 2020 2:30 PM and Sunday, October 11, 2020 7:15 PM.