Engineering works: 's-Hertogenbosch - Eindhoven
Situation
Between 's-Hertogenbosch and Eindhoven Centraal the timetable is changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Sunday, September 27, 2020 4:00 AM hours and Monday, September 28, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between 's-Hertogenbosch, Vught and Boxtel.
- Express buses are running between 's-Hertogenbosch and Eindhoven Centraal.
- Intercity 800 Alkmaar - Utrecht C. - Eindhoven C. - Maastricht is cancelled between 's-Hertogenbosch and Maastricht
- Intercity 2900 Enkhuizen - Utrecht C. - Eindhoven C. - Maastricht is cancelled between 's-Hertogenbosch and Maastricht
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo is cancelled between 's-Hertogenbosch and Venlo
- Intercity 3900 Enkhuizen - Utrecht C. - Eindhoven C. - Heerlen is cancelled between Amsterdam Centraal and Heerlen
- Sprinter 4400 Oss - 's-Hertogenbosch - Eindhoven C. - Deurne is cancelled between 's-Hertogenbosch and Boxtel
- Intercity 700800 Eindhoven C. - Maastricht runs as extra service between Eindhoven Centraal and Maastricht
- Intercity 702900 Eindhoven C. - Maastricht runs as extra service between Eindhoven Centraal and Maastricht
- Intercity 703500 Eindhoven C. - Venlo runs as extra service between Eindhoven Centraal and Venlo
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, September 27, 2020 4:00 AM and Monday, September 28, 2020 2:00 AM.