Engineering works: 's-Hertogenbosch - Tilburg
Situation
Between 's-Hertogenbosch and Tilburg: restrictions are cancelled. Trains are running according to the timetable.
Period
On Sunday, October 4, 2020 between 4:00 AM and 9:45 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 6600 Dordrecht - Breda - 's-Hertogenbosch - Arnhem C. is cancelled between 's-Hertogenbosch and Tilburg
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, October 4, 2020 4:00 AM and Sunday, October 4, 2020 9:45 AM.