Engineering works: Tilburg - Eindhoven
Situation
Between Tilburg and Eindhoven Centraal: restrictions are cancelled. Trains are running according to the timetable.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, October 3, 2020 2:00 AM hours and Monday, October 5, 2020 4:00 AM hours.
Advice
Passengers between Tilburg and Eindhoven Centraal travel via 's-Hertogenbosch.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Tilburg, Oisterwijk and Boxtel.
- Intercity 1100 Den Haag C. - Rotterdam C. - Breda is cancelled between Tilburg and Eindhoven Centraal
- Sprinter 5200 Tilburg Uni. - Eindhoven C. is cancelled between Tilburg Universiteit and Boxtel
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, October 3, 2020 2:00 AM and Monday, October 5, 2020 4:00 AM.