Engineering works: Zwolle - Groningen
Situation
Between Groningen and Meppel the timetable is changed due to engineering works.
There is no additional travel time..
Period
On Saturday, September 12, 2020 between 9:00 AM and 9:40 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 500 Rotterdam C. - Utrecht C. - Zwolle - Groningen is cancelled between Groningen and Meppel (only in direction of Meppel)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, September 12, 2020 9:00 AM and Saturday, September 12, 2020 9:40 AM.