Engineering works: Leeuwarden - Harlingen Haven
Situation
Between Leeuwarden and Harlingen Haven: restrictions are cancelled. Trains are running according to the timetable.
The extra travel time may be up to 30 minutes.
Period
Between Sunday, October 4, 2020 4:00 AM hours and Monday, October 5, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Leeuwarden, Deinum, Dronryp, Franeker, Harlingen and Harlingen Haven.
- Stoptrein 37200 Leeuwarden - Harlingen - Harlingen Haven is cancelled between Leeuwarden and Harlingen Haven
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, October 4, 2020 4:00 AM and Monday, October 5, 2020 2:00 AM.