Engineering works: Roosendaal - Vlissingen
Situation
Between Roosendaal and Goes buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, September 19, 2020 4:00 AM hours and Monday, September 21, 2020 2:00 AM hours.
Advice
Passengers between Kapelle-Biezelinge and Kruiningen-Yerseke and Roosendaal travel via Goes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Roosendaal, Bergen op Zoom, Rilland-Bath, Krabbendijke and Kruiningen-Yerseke.
- Buses are running between Goes and Kapelle-Biezelinge.
- Buses are running between Roosendaal, Bergen op Zoom, Kruiningen-Yerseke and Goes.
- Intercity 2200 Amsterdam C. - Haarlem - Rotterdam C. - Vlissingen is cancelled between Roosendaal and Goes
- Intercity 702200 Goes - Vlissingen runs as extra service between Goes and Vlissingen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, September 19, 2020 4:00 AM and Monday, September 21, 2020 2:00 AM.