engineering works

Engineering works: Amsterdam - Schiphol

Situation

Between Amsterdam Centraal and Schiphol Airport: restrictions are cancelled. Trains are running according to the timetable.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, October 3, 2020 2:30 AM hours and Monday, October 5, 2020 5:00 AM hours.

Advice

Passengers between Amsterdam Centraal and Leiden Centraal travel via Haarlem.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, October 3, 2020 2:30 AM and Monday, October 5, 2020 5:00 AM.