Engineering works: Arnhem - Winterswijk
Situation
Between Terborg and Winterswijk buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, September 19, 2020 4:00 AM hours and Monday, September 21, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Terborg, Varsseveld, Aalten and Winterswijk.
- Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Winterswijk and Terborg
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 19, 2020 4:00 AM and Monday, September 21, 2020 2:00 AM.