Engineering works elsewhere: Breukelen - Utrecht - Veenendaal
Situation
Between Breukelen and Veenendaal Centrum the timetable is changed due to engineering works elsewhere.
The extra travel time may be up to 30 minutes.
Period
Between Friday, September 11, 2020 4:00 AM hours and Monday, September 14, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 5500 Utrecht C. - Baarn continues to Bunnik, Maarn and Veenendaal Centrum from Utrecht Centraal
- Sprinter 5600 Utrecht C. - Amersfoort C. - Zwolle continues to Bunnik, Maarn and Rhenen from Utrecht Centraal
- Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Utrecht Centraal and Veenendaal Centrum
- Sprinter 7400 Uitgeest - Amsterdam C. - Utrecht C. - Rhenen is cancelled between Utrecht Centraal and Rhenen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, September 11, 2020 4:00 AM and Monday, September 14, 2020 2:00 AM.